Solar Off-Grid System + Solar Water Pumping System for RO Plant

Itehaad Town Orangi

Ittehad Town, Orangi, Karachi

Itehaad Town Orangi solar project installation in Ittehad Town, Orangi, Karachi

Date

2018-12-30

Location

Ittehad Town, Orangi, Karachi

Client

Mr. Inayat

Project record

This is 11 kW system which is combination of 5 kW of solar off-grid System and 5 kW Solar Pumping System to run the motors of RO Plant. The owner of this house is now tension free from all sort of excessive power outages and also saving a lot of money. Two inverters are used for this project, one is Off-grid inverter and the other one is three phase solar VFD Inverter for motor of pump of RO plant. 4 batteries were also used to provide backup to Off-grid system during night time.

Planning a related project?

Talk to SSES

Project questions

About the Itehaad Town Orangi installation.

What type of solar system was installed for Itehaad Town Orangi?

This SSES project record documents a Solar Off-Grid System + Solar Water Pumping System for RO Plant installation. The page lists the recorded location, client and project date where those details are available.

Where was the Itehaad Town Orangi project completed?

The recorded project location is Ittehad Town, Orangi, Karachi.

Can SSES design a similar system for another site?

Yes, subject to a new site and load assessment. An existing project can demonstrate relevant experience, but it cannot replace current engineering calculations or a site-specific quotation.