Mr. Yousuf Khan (General Manager, Matiari Sugar Mills Ltd)
Project record
This is a 9 kW Solar On-Grid System which was installed by SSES at Gulshan e Maymar, Karachi. This system is running all the load of the house on Solar Power at day time and exporting the surplus energy generated to the grid. Client is very happy with the project and gave us a very positive feedback. Client observed a major reduction in electricity bill due to which the return of investment (ROI) will be within 3 years.
What type of solar system was installed for 9 kW Solar On-Grid System?+−
This SSES project record documents a Solar On-Grid System installation. The page lists the recorded location, client and project date where those details are available.
Where was the 9 kW Solar On-Grid System project completed?+−
The recorded project location is Gulshan e Maymar, Karachi.
Can SSES design a similar system for another site?+−
Yes, subject to a new site and load assessment. An existing project can demonstrate relevant experience, but it cannot replace current engineering calculations or a site-specific quotation.